May 2023
- Hoarding has been installed in the East Block corridor between the Disposal Room and Chapel.
- This is to allow for the demolition of a section of the wall which will become the entrance to the new temporary corridor into Building A as part of Stage 2 enabling works.
Traffic conditions have changed around Building E (East Block) where the new Pathology Department is being built. A secondary pedestrian crossing with pram and wheelchair ramps has been installed, as well as a boom lift near the Oral Health building leading to the Building E patient drop off zone. These changes will be in place until June 2023.